本文由无锡志丰工程机械设备厂提供,更多电缆输送机、发黑处理 资讯请访问:www.wxzfgc.com

电缆沿墙吊挂敷设,是先将挂钉预埋在墙内,然后将挂钩挂在挂钉上,电缆放入挂钩即可。挂钩间距:电力电缆为1 m,控制电缆为0.8m。挂钩不超过3 层。电缆沿墙卡设,是先将预制好的电缆支架预埋在墙内,然后把电缆用卡子固定在预埋支架上。电缆输送机沿柱卡设先将抱箍支架卡设在柱子上,再将保护钢管卡设在支架上,此法适用于电缆穿钢管沿柱垂直敷设。
Cable, hanging along the wall is to hang a nail embedded inside the wall, then hook hanging on a peg, cable into the hook.Hook spacing: power cable is 1 m, control cable is 0.8 m.Peg no more than three layers.Cable card set along the wall, is preformed first cable bracket embedded inside the wall, and you could use the cable clamp is fixed on the bracket of embedded.Cable along the column CARDS will embrace hoop bracket in post card first, then will protect steel pipe card in stents, this method is suitable for vertical laying cable wear steel tube along the column. |